Station 1 Concept Drawings
The architect has generated a set of concept drawings based on the design so far. The concept includes: 6 drive-through apparatus bays living space for… Read More »Station 1 Concept Drawings
The architect has generated a set of concept drawings based on the design so far. The concept includes: 6 drive-through apparatus bays living space for… Read More »Station 1 Concept Drawings
The demolition of the old hotel and furniture buildings has been completed. The concrete slabs have been left in place to prevent erosion, and will… Read More »Demolition Complete
Demolition of the old Hotel has begun. GVFRS has begun the process to remove the old buildings from the Booker property to make room for… Read More »Demolition Starts on the Booker Property